top of page

Video: Shipping dredgers from shed to river

Updated: Aug 28, 2019

Two weeks ago (11 August 2019), we loaded 2 x 16m steel mussel dredgers onto the SAL Heavy Lift for shipping to Denmark (see second video further below).

But before we could do that, we needed to complete the dredgers outside the shed. That required shifting them from the shed to the river on 11 June 2019.


Above is a short video showing the move from the shed to the river.


Below is the video of the dredgers being lifted onto the Sal Heavy Lift ship.

33 views0 comments

Comments


Factory Address: Factory No. 4, Depot Saigon, Street No. 1 Long Thoi Commune, Nha Be District, Ho Chi Minh City, Vietnam. See Google Maps.

 

Invoicing / correspondence: Factory No. 4, 9 Nguyen Van Tao Street, Long Thoi Commune, Nha Be District, HCMC, Vietnam.

Phone (English & Tiếng Việt): 
(+84) 28 3636 3220

Email: phil@TriacComposites.com

©2018 by Triac Composites. Proudly created with Wix.com

bottom of page